Z-zwo

Efficient renovation with BIPV

With the complete renovation of its Z2 corporate building in Stuttgart, Ed. Züblin AG is sending a clear message about sustainable construction. Over a period of just 18 months, the six-storey office building was completely redesigned using a sophisticated, building-integrated photovoltaic façade and Cradle to Cradle-certified systems from Schüco.

Reference details

Type of Building Office and administration
Product areas Windows Facades BIPV
Schüco Systems AWS 65 FWS 50 BIPV
Features Refurbishment Decarbonization Energy efficiency Cradle-to-Cradle
Location Stuttgart Degerloch, Baden-Württemberg
Completion 2024
Architects Ed. Züblin AG
Specialist company Forster Fassadentechnik GmbH,Schwend Metallbau
Picture credits © Achim Birnbaum Teutonenstraße 4 70771 Leinfelden-Echterdingen

Efficient processes and modular planning

The conversion of the six-storey existing building required the highest level of precision in planning and execution. Digital cycle control and generative design allowed building processes to be optimised. The building shell and stairwells were preserved, while the façade and interior were completely renovated. Cradle to Cradle certified materials and reusable dry walling units reduced construction time and the amount of waste. Close collaboration between planning, fabrication and installation ensured timely completion of the project.

BIPV façade for technical, aesthetic precision

The building integrated photovoltaics were part of the renovation strategy right from the very beginning and were seen as an architectural principle. The anthracite-coloured modules give the building its characteristic appearance and are precisely integrated into the horizontal structure. They are arranged in a standard grid of 1.35 x 0.9 metres and also take on a safety barrier function in the fascia area as a “PV fence”. The system comprises a total of around 350 façade modules producing 107 kWp, while the PV fence produces 29.1 kWp. Due to shading, the layout was adapted to suit the specific building, with more of the modules arranged on the east side to take advantage of the higher irradiation potential. The modular BIPV layout therefore takes into account the different irradiation zones, so that sections of the façade with less exposure can also deliver usable yields. Different module formats and string lengths were balanced using module optimisers. The pre-assembled modules were installed using standardised attachments and all maintenance points are accessible via the façade brackets. A smart meter system records the yields and provides the data required for building operation.

Pioneering system integration

Integration of the BIPV modules was carried out as part of a collaboration between ZÜBLIN and Schüco – from system planning right through to integration in the building automation system. The FWS 50.SI, FWS 60, AOC, USC 65 and AWS 75.SI systems were used, as well as the ADS 80 FR30 and ADS 90 FR30 door systems. Combining different profile series enabled precise adaptation to the varying façade geometry. The complex concave and convex façade sections were fabricated using heat and fitted on site once cooled, which allowed the curvature of the façade to be accurately reproduced. All components were digitally recorded and coordinated, in order to efficiently control the fabrication and installation processes. Integration into the energy management system ensures seamless monitoring of system data and supports maintenance and operation.

Carbon Control - Gebäude mit den Carbon Bubbles auf schwarzem Hintergrund

Schüco Carbon Control

Find out more about our comprehensive range of products and services for the decarbonisation of buildings.

Schüco Carbon Control

Product information

AWS 65

Schüco Window System AWS 65

High-quality aluminium system with comprehensive range of solutions

As part of the Schüco AWS system platform, the thermally insulated window system offers an extensive range of solutions for the 65 mm basic depth to meet a variety of building envelope requirements.

Learn more

FWS 50

Schüco Façade System FWS 50

High-performance mullion/transom façade with 50 mm face width – the basis for a variety of solutions

The Schüco FWS 50 façade system is an impressive basic system for façades and skylight areas with a high level of flexibility and attractive design options, including optimised fabrication and installation processes. Thanks to a broad system range, solutions for the most varied requirements and applications can be implemented.

Learn more

BIPV

Schüco Building Integrated Photovoltaics

Efficient solutions for sustainable energy generation in buildings

In accordance with EU construction guideline “2010/31/EU”, from 2021 every new building in EU member states must be constructed as a “nearly zero energy building” with a largely compensated overall energy efficiency. In this context, the federal government of Germany is aiming to make a climate-neutral building economy a reality by 2050.

Learn more