BRUCITY

Contemporary administrative architecture with a focus on transparency

The Brucity Administrative Centre in Brussels is a fully glazed building structure. The striking glass façade fulfils a range of functions: it maximises the entry of daylight, minimises shadowing over surrounding buildings and, in a more figurative sense, represents the transparency of democratic processes. Inside the building, work spaces for around 1600 employees are arranged in a circular formation around a central atrium, which sits at an elevated level above the publicly accessible ground floor.

Reference details

Type of Building Office and administration
Product areas Doors Facades
Schüco Systems ADS 75 HD.HI FWS 60
Features New build
Location Brussels, Belgium
Completion 2022
Architects B2Ai Brussel
Specialist company Groven + NV Industriezone Pullaar,Vorsselmans N.V.
Picture credits © Serge Brison

Product information

ADS 75 HD.HI

Schüco Door System ADS 75 HD.HI

Multifunctional solution for large-format commercial doors with high continuous loads

The Schüco ADS 75 HD.HI (Heavy Duty High Insulated) aluminium door system combines high durability with multiple functions and attractive design options – perfect for challenging commercial buildings with high security requirements.

Learn more

FWS 60

Schüco Façade System FWS 60

High-performance mullion/transom façade with 60 mm face width – the basis for a variety of solutions

The Schüco FWS 60 façade system is an impressive basic system for façades and skylight areas with a high level of flexibility and attractive design options, including optimised fabrication and installation processes. Thanks to a broad system range, solutions for the most varied requirements and applications can be implemented.

Learn more