H1

Confident in a brand new look

The former telecommunications tower has dominated the Bielefeld cityscape since the 1970s. Following its comprehensive modernisation, the building now has a new name and a new appearance: after the extensive revitalisation project, including a redesign of the façade, it now has a fresh new look as “H1”. Goldbeck took on the roles of client, investor, main contractor and planner all at the same time.

参照の詳細

建物タイプ 복합개발 및 복합용도 건축물
製品分野 ドア ファサード 太陽光遮蔽システム
シューコーシステム AWS 90.SI+ FWS 60.SI ADS 80 FR 30
特徴 리모델링 DGNB
所在地 Bielefeld, Germany
完成 2024
設計者 Goldbeck
専門会社 Goldbeck
画像クレジット © GOLDBECK GmbH / Christian Eblenkamp

Sustainable revitalisation with a future

Before planning could begin, fundamental decisions had to be made with regard to the future use of the property. As part of the analysis of the existing building, the condition of the building was assessed and the limitations were identified. Demolition and reconstruction were out of the question for both economic and regulatory reasons, as rebuilding with a height of 74.26 metres would not have been feasible due to building regulations. In addition, the high-quality reinforced concrete structure, which could be preserved without significantly contributing to pollution levels, made a convincing argument for renovation. After examining different usage concepts, the decision was made to create a multi-tenant office building while simultaneously revitalising the property to meet new building standards.

High-quality window solution instead of a unitised façade

The façade was implemented using the AWS 90.SI+ window. The new façade echoes the horizontal structure of the previous building but offers significantly larger window areas and emphasises the horizontal lines using narrow cassette cladding with rounded corners. Together with the larger window proportions, this helps to create a seamless façade appearance that allows plenty of light into the building. In the sill area, a mullion/transom construction based on the Schüco FWS 60.SI system ensures maximum transparency. The bright white cassette cladding elegantly curves around the façade and gives the main entrance on the ground floor an eye-catching and welcoming appearance.

Neuer Inhalt (1)
A special design feature of the “H1” is the rounded corners of the façade.

Planning challenges

While the high-rise building was being gutted floor by floor and the old façade was being dismantled from top to bottom using mast climbing work platforms, structural planning for the new façade was getting underway. A 3D laser scan offered a precise overview of the not insignificant differences between the measurement reference point and the unit joint of the old façade. It also provided planners with valuable data that was used to define a uniform height for the window units and to compensate for tolerances from the existing building shell through the substructure.

製品情報

FWS 60.SI

Schüco Façade System FWS 60.SI

パッシブハウス認証の方立/無目ファサード

Schüco FWS 60.SI (Super Insulated / 超高断熱) ファサードシステムは効率的な加工/製作と施工を保証します。また、革新的な絶縁材を使用することで、パッシブハウス基準を満たした高断熱ソリューションです。

見付け幅60mmのシステムは断熱性に優れているだけでなく、システムの適用範囲が広く、さまざまな建築要件に柔軟に対応が可能なため、ハイエンドな高層居住用ビルや商業ビルなどに最適なシステムです。

枠一体型の透明スパンドレル防護柵は継ぎ目が目立たず、シームレスかつエレガントな一体感をもたらします。統一された見付けと継ぎ目が目立たない形材は、天井まで伸びる開口部と低いスパンドレル部、および腰窓用防護柵の耐荷重要件を満たしています。

基準奥行とカバー材の種類が豊富で、魅力的な外観設計が可能です。

システムに最適化された部品を用いることで、Schücoの自動開閉ユニットやサンシェードシステムなどの電子部品をシンプルかつ安全に統合することが可能です。

もっと詳しく