The KÖ4 building on Kölnische Straße in Kassel has been comprehensively refurbished to create a new architectural identity, optimise the building’s layout and use, and significantly enhance its energy performance. Today, the building combines a distinctive, energy-efficient façade with significantly improved comfort for its occupants.

项目案例详情

建筑类型 办公与行政
产品 幕墙
旭格系统 FWS 60 AD UP 75
特征 翻新改造 BREEAM认证
地点 Kassel, Hessen
竣工时间 2024
建筑师 Hammerschmidt Architects GmbH
专业公司 hilzinger Metallbau GmbH
图片版权 © Stefan Schilling

Energy-efficient façade refurbishment

The client, GWH Wohnungsbaugesellschaft mbH Hessen, aimed to improve the energy performance of the ageing building while retaining its existing fabric. At the heart of the project was a complete redesign of the façade, creating a new building envelope that would enhance both energy efficiency and user comfort. A seven-member jury selected the concept developed by the Frankfurt-based design team Dietz Joppien Hammerschmidt. The proposal covered the entire ten-storey building, including the projecting stairwell and the two-storey commercial extension. It also took into account the building’s integration into the surrounding urban environment and its contribution to the character of Kassel city centre. The building was also upgraded to meet current fire-safety requirements. Its roof areas were transformed into landscaped spaces for occupants to use, while sections of the façade were adapted to generate electricity.

240815_Schüco_Keyvisual_Erlkönig

Schüco Value Up

Find out more about our comprehensive range of services for maintaining the value of existing buildings.

了解更多​

A transformation with a visible impact

A total of €8.75 million was invested in the refurbishment, with approximately one third of this amount allocated to the façade works. The defining architectural feature is the three-dimensional metal façade, formed from powder-coated perforated aluminium cassette panels. The sculptural folds create striking patterns of light and shadow on the gable façade and throughout the building’s interior, including its offices and other occupied areas, making the building instantly recognisable. Along both long elevations, 1,025 m² of Schüco FWS 60.SI was installed from the second to the ninth floor. The mullion-and-transom façade is consistently structured by vertical and horizontal lines, combining opening units with fixed glazing and black glass panels. At ground and first-floor level, a further 180 m² of mullion-and-transom façade with a large-format grid creates a light-filled frontage and brings generous amounts of daylight into the building.

Sections of the façade generate electricity

The south-facing wall of the projecting stairwell was fitted with a building-integrated photovoltaic façade across its entire height. Hilzinger Metallbau integrated the PV modules into the surrounding aluminium frames at its factory. The 188 m² façade now incorporates 45 PV modules, which generate power for the building and contribute to a more sustainable energy supply.

Perforation as a design principle

The three-dimensional perforated metal façade on the gable end defines the appearance of the building. Developed using BIM and parametric design tools, the precisely arranged perforations give the façade its sculptural quality. Gold-coloured perforated metal cassettes set against a black substructure create the impression of a building envelope that is almost floating.

产品信息

FWS 60

旭格FWS 60幕墙系统

性能卓越的构件式幕墙,可视面宽度60 mm — 为实现不同系统解决方案打下基础

作为幕墙和采光顶的基础系统,旭格FWS 60幕墙系统提供极大的灵活度和引人注目的设计选项 – 且优化了加工和安装进程。广泛的系统类型打造多种解决方案,满足多样化的要求,实现各种应用。

整合进型材的通透护栏系统天衣无缝地融入幕墙外立面。无需打断型材即可满足落地窗式开启单元的防护要求和极低的护栏高度,型材可视面宽度保持不变。

这个可视面宽度为60 mm的构件式幕墙系统实现极高程度的设计自由,提供多种压板和幕墙罩盖选项,并能和旭格门、窗、推拉系统组合使用。

经过优化的系统组件保证轻松安全地整合电动组件,如用于自动化旭格门系统或遮阳装置。

了解更多​

AD UP 75

旭格AD UP 75门系统

普遍适用于使用频率极高的商建楼宇大门和注重设计的入户门

旭格AD UP 75门系统将良好的隔热性能与极高的稳定性相结合,结构深度为75 mm,为高端住宅和商建项目提供极高的功能保障,满足所有要求。

凭借突破性的结构原理和模块化密封胶条系统,旭格AD UP 75为铝合金门系统设定隔热、水密性、承重能力和耐久性新标准。广泛的五金和设计选项帮助打造时尚的门系统解决方案,满足生活工作所有领域的各种要求。该门系统能与门通讯系统及门禁出入控制系统完美组合。

了解更多​

Refurbishment while the building remained in use

Despite the extensive refurbishment works, the building remained largely operational throughout the construction period. To minimise disruption for occupants, particular emphasis was placed on the efficient and carefully coordinated installation of the new façade. Hilzinger organised the works so that office staff could continue working throughout the project, with only limited disruption. This placed considerable demands on planning, logistics and execution, and required close coordination between all parties involved in the project.