Schüco Corporate Services

Choosing modernisation over newbuild

The Schüco Corporate Services building has been completely modernised from top to bottom. All of the aluminium components from the existing building were fed back into the raw material cycle to be recycled. In their place is now a Cradle-to-Cradle certified AF UDC 80 unitised façade, which gives the building a new lease of life. With regard to the office design, Schüco followed the concept of New Work, a forward-thinking approach to the workplace.

Informacje o obiekcie referencyjnym

Rodzaj budynku Biuro i administracja
Rodzaje produktów Okna Drzwi Fasady FACID Wentylacja Ochrona przeciwsłoneczna Bezpieczeństwo Automatyka budynku
Systemy Schüco FWS 50.SI AWS 75 PD.SI AF UDC 80 ADS 80 FR 30 FWS 60.HI FWS 60 AD UP 75 AWS 75 BS.HI+ AWS 75.SI+ FACID 65 FWS 50 FireStop ADS 76.NI SP
Cechy Modernizacja Efektywność energetyczna Cradle-to-Cradle Cyrkularność
Lokalizacja Bielefeld, Germany
Zakończenie 2021
Architekci tr.architekten Rössing-Tilicke
Firma specjalistyczna Hilzinger Metallbau
Zdjęcia Frank Peterschröder

A milestone on the company campus

The Schüco company headquarters has been expanded and restructured continually since 2016. One renovated building is the Digital Hub One office complex, a former production hall which has been modernised according to the principles of New Work, while newbuilds include the Schüco One building designed by architectural practice 3XN and the Schüco carpark with its striking textile façade. After three years of renovation work, the Schüco Corporate Services building was made available to its users, the Finance and IT departments, at the end of 2021.

Three building structures, one unit

The complex is comprised of three building structures made of reinforced concrete: a seven-storey construction facing the future company headquarters Schüco One, a six-storey building along Karolinenstraße and a long, two-storey low-rise parallel to Herforder Straße. These three buildings were constructed one-by-one from the 1960s to the 1980s. In 2001, the façade of the complex, which was constructed as a Schüco ribbon window system, received a second suspended skin made of glass and aluminium. The interior of UZB, however, had remained largely unchanged, with its components more or less in their original condition. 

Fundamental restructuring

The main reason for the most recent conversion was the fact that the existing building fabric no longer complied with current fire protection requirements. While examining the building further, other technical and functional shortcomings were found, for example with regard to the service and sanitation systems and barrier-free access. Aesthetically speaking, the complex was also in need of an update. The colours of the interior had not been changed since the 1980s, and the suspended ceilings in the corridors and offices were outdated. To add to that, there was a lack of open workspaces and smart, inviting rooms for informal communication. It was clear to Schüco and the Cologne-based architectural practice tr.architekten, who were commissioned to create the design, that the complex was not only in need of technical renovations but would also require a complete refurbishment of the interior.

Geöffnete Schiebetür von Schüco mit Blick in den Wohnbereich

The New Work workplace concept

The design team approached the renovation in various stages. The office levels were completely redesigned in line with the principles of New Work. The areas are designed to accommodate 160 Schüco employees. Rooms for meetings with external auditors and tax advisors were also constructed. Open areas with the option of desk sharing, individual offices providing a quiet working environment, as well as meeting rooms and zones for informal communication alternate with one another in the floor plans. The end users of the complex were also involved throughout the design process, in order to increase acceptance of the new ways of working.

Acquired usable space

The reception and foyer and the staircases and lifts were also given a new lease of life. To do this, the existing lift shaft in the centre of the building was removed. A new lift was constructed at the intersection of the three building structures, at the rear-facing courtyard façade. The design team repurposed the extra usable space into open-plan communication zones.

A timeless building envelope

Another key element of the new design was to reinvigorate the façade, which required the existing aluminium components to be dismantled. "With the Schüco Corporate Services building, we've followed a holistic design approach," explains André Schreiber, the architect at Schüco responsible for the project. "This means that the façades should also be long-lasting and timeless. In keeping with the idea of showcasing as many of our products in use as possible on the campus, we have put the Cradle to Cradle-certified AF UDC 80 unitised façade to use for the very first time. "Even with the new building envelope, the three parts of the existing building are still recognisable as distinct structures. At the same time, the unitised façade lends them a muted, homogenous external appearance. In this way, the Schüco Corporate Services building offers a refreshing contrast to the bold and expressive design of the Schüco One newbuild opposite.

Geöffnete Schiebetür von Schüco mit Blick in den Wohnbereich

Project-specific details

The unitised construction of the UDC 80 façade enables it to be easily adapted to any type of structural scenario and distribution of functions in the building. The façade of the Schüco Corporate Services building was assembled out of around 332 prefabricated units. Vent and panoramic windows, closed panel fields, and ventilation vents are alternated throughout the façade. For the first time, the Schüco AB ZDS (Aluminium Blind Zip Design Screen) sun shading system, which is an external, textile roller blind system, was integrated in the unitised façade.  The cover caps on the windows are another special detail of this project. These extend from the façade in three different lengths, creating a subtle play of shadows on the building envelope.

Back into the raw material cycle

As soon as the decision was made to renovate the façade, Schüco was determined to make recycling a priority. The existing façade of the complex from the 1980s and 2000s contained a large amount of aluminium. Schüco is also a founding member of the A|U|F, an association which organises a closed-loop recycling process for aluminium from the window, door and façade industry. It was natural, then, to dismantle all of the aluminium components from the façade and canopy, and feed them back into the A|U|F raw material cycle. In order to ensure that only aluminium was fed into the cycle, the company in charge of demolition collected the individual constituent materials in separate containers as much as possible. The aluminium was then recycled in several container loads by companies belonging to the A|U|F. In total, 28 tonnes of the material were extracted from the building, which was confirmed by European Aluminium (EA) following an external audit, which confirmed a recycling rate of 98.3%.

Geöffnete Schiebetür von Schüco mit Blick in den Wohnbereich

Recycling rates recorded for the first time

In 2014, the EA began to survey the recycling rate of different buildings in Europe following demolition or renovation in order to independently confirm high recycling rates of aluminium. This figure is also used in the basic assumptions when calculating an Environmental Product Declaration (EPD). Before long, the EA began a new way of measuring recycling rates. They called on their members to name projects that would verify their recycling rates. Schüco answered this call. The audit results from the Schüco Corporate Services building were the first to be included in this new survey. 

A holistic approach

In addition to the UDC 80, other C2C Silver-certified products were used such as the FWS 50 / 60 SG mullion/transom construction for the entrance façade, the AWS 75 BS insert units and the AD UP 75 doors. Following the renovation, the building now meets the ambitious KfW 70 standard and consumes 265,000 kWh less primary energy per year than before as a result. The renovated building is supplied with certified green energy and receives heating energy and hot water via district heating.

Building materials from renewable resources

The roofs, for instance, are insulated with cellulose fibres. A green roof is also in the works. This 500 m² green space will encourage insect diversity, improve the microclimate both in and around the building, and reduce noise and pollution. The construction companies similarly took precautions to minimise pollution and noise while they worked on the building. Schüco chose to work predominantly with local businesses to reduce time spent on construction and on transporting materials. The project is being subsidised by the Ministry for the Environment, Conservation, Agriculture, and Consumer Protection in the state of North Rhine-Westphalia. 

Informacje o produkcie

FWS 50.SI

System fasad Schüco FWS 50.SI

Fasada słupowo-ryglowa z certyfikatem domu pasywnego o szerokiej gamie różnorodnych zastosowań

System fasadowy Schüco FWS 50. SI (Super Insulated) bazujący na nowatorskiej technologii izolatorów, umożliwia realizację szerokiej gamy fasad i świetlików dachowych o najwyższej izolacyjności cieplnej na poziomie pasywnym, przy zapewnieniu zoptymalizowanych procesów produkcji i montażu.

Dowiedz się więcej

AWS 75 PD.SI

System okienny Schüco AWS 75 PD.SI

Maksymalna transparentność dzięki minimalnej szerokości czołowej

Harmonijna integracja formy i funkcji jest oprócz energooszczędności podstawowym wymogiem realizacji nowoczesnych przegród zewnętrznych. System okienny Schüco AWS 75 PD.SI (Panorama Design Super Insulated) umożliwia realizację ślusarki otworowej o minimalnej szerokości profili w widoku od wewnątrz i na zewnątrz oraz doskonałej izolacyjności cieplnej i w sposób optymalny spełnia wszystkie wymagania architektoniczne.

Dowiedz się więcej

AF UDC 80

System fasad Schüco AF UDC 80

Dynamiczna fasada elementowa o dużej swobodzie projektowania

System fasadowy Schüco AF UDC 80 (Aluminium Façade Unitized Dynamic Construction) stanowi część platformy aluminiowych fasad elementowych Schüco AF UDC 80. Dzięki skalowalnym i przetestowanym zespołom dynamiczny system oferuje architektom, projektantom i wykonawcom łatwy sposób realizacji inwestycji budowlanych z fasadami elementowymi o szerokiej gamie zastosowań i opcji projektowych opartych na racjonalnym planowaniu i obróbce.

Dowiedz się więcej

ADS 80 FR 30

System drzwiowy Schüco ADS 80 FR 30

Przeciwpożarowe drzwi i ściany o szerokim spektrum zastosowań

Sprawdzony system drzwiowy Schüco ADS 80 FR 30 (Fire Resistant) o głębokości zabudowy 80 mm, bazujący na bardzo stabilnych 5-komorowych profilach, przekonuje wszechstronnością zastosowań, funkcjonalnością i wzornictwem.

Dowiedz się więcej

FWS 60

System fasad Schüco FWS 60

Nowa fasada słupowo-ryglowa Schüco FWS 60 łączy maksymalnie uproszczoną obróbkę z najlepszą efektywnością energetyczną na poziomie budownictwa pasywnego.

Fasada Schüco FWS 60 wyznacza nowe standardy w zakresie obróbki i efektywności energetycznej. Dobrze sprawdzone systemy zostały udoskonalone przede wszystkim pod kątem wygodniejszej obróbki w warsztacie i na budowie. Nowe, prefabrykowane komponenty systemowe zapewniają np. znacznie szybsze, a tym samym bardziej wydajne wykonawstwo.

Dowiedz się więcej

AD UP 75

System drzwiowy Schüco AD UP 75

System drzwi o uniwersalnym przeznaczeniu: od obiektów komercyjnych o dużym natężeniu ruchu po budownictwo mieszkaniowe

System drzwiowy Schüco AD UP 75 o głębokości zabudowy 75 mm, oferuje doskonałą izolacyjność cieplną w połączeniu z dużą stabilnością. Ponadto zapewnia wysoką niezawodność funkcjonalną wymaganą we wszystkich obszarach budownictwa mieszkaniowego i komercyjnego o wysokim standardzie.

Dowiedz się więcej

AWS 75 BS.HI+

System okienny Schüco AWS 75 BS.HI+

Okna blokowe o wysokiej izolacyjności cieplnej spełniające wysokie wymagania w zakresie wzornictwa

Dzięki wysokiej izolacyjności cieplnej i smuklej konstrukcji z ukrytym skrzydłem system okien blokowych Schüco AWS 75 BS.HI+ (Block System High Insulated) spełnia najwyższe wymagania energetyczne i architektoniczne przy jednoczesnym zapewnieniu maksymalnej transparentności.

Dowiedz się więcej

AWS 75.SI+

System okienny Schüco AWS 75.SI+

Lepsza izolacyjność cieplna, bezpieczeństwo i produkcja

Zoptymalizowany standardowy system okienny Schüco AWS 75.SI+ (Super Insulated) o głębokości zabudowy 75 mm jest częścią platformy systemowej Schüco AWS i stanowi bazę dla szerokiego zakresu zastosowań w energooszczędnych przegrodach budowlanych. W zależności od wymagań architektonicznych, wysoko izolowany system aluminiowy może być stosowany jako okna elewacyjne, okna wstęgowe, wpinane w fasadę lub łączony z systemami drzwiowymi Schüco.

Dowiedz się więcej

FACID 65

System fasad Schüco FACID 65

Wielofunkcyjna fasada tekstylna o szerokiej gamie zastosowań i wersji wzorniczych

Idea zrównoważonego budownictwa w coraz większej mierze dotyczy całego cyklu życia budynków. W związku z tym rośnie także nacisk na funkcjonalność i elastyczność rozwiązań fasadowych. Dzięki tekstylnej fasadzie Schüco FACID 65 zewnętrzny wygląd budynku może zostać szybko dostosowany do zmieniających się wymagań, efektywnie i w dowolnym czasie, bez wyłączania obiektu z użytku – to ważny krok w dziedzinie transformowalnych fasad.

Dowiedz się więcej

FWS 50

System fasad Schüco FWS 50

Nowa fasada słupowo-ryglowa Schüco FWS 50 łączy prostotę obróbki z najlepszą efektywnością energetyczną na poziomie budownictwa pasywnego.

Fasada Schüco FWS 50 wyznacza nowe standardy w zakresie obróbki i efektywności energetycznej. Dobrze sprawdzone systemy zostały udoskonalone przede wszystkim pod kątem wygodniejszej obróbki w warsztacie i na budowie. Nowe, prefabrykowane komponenty systemowe zapewniają np. znacznie szybsze, a tym samym bardziej wydajne wykonawstwo.

Dowiedz się więcej

FireStop ADS 76.NI SP

System drzwiowy Schüco FireStop ADS 76.NI SP

Nieizolowane drzwi dymoszczelne o maksymalnej elastyczności

System nieizolowanych, dymoszczelnych drzwi Schüco FireStop ADS 76.NI SP (Non Insulated Smoke Protection) z innowacyjnym profilem jednokomorowym i otwartym wrębem bazuje na platformie Schüco FireStop, co zapewnia wysoki stopień elastyczności podczas planowaniu i realizacji.

Dowiedz się więcej