EUREF-Gasometer

Industrial landmark as a structural statement of the energy revolution

Once a symbol of the Industrial Age, the Gasometer in Berlin Schöneberg has undergone a complete renovation to become an office and events centre. To do this, an office tower with 35,000 m2 of usable space was integrated into the listed steel structure. A high level of prefabrication ensured both precision and efficient installation. 

Referensdetaljer

Byggnadstyp Kvarter och blandad användning
Produktområden Fönster Dörrar Fasader Solskydd
Schüco-system FWS 50 ADS 75 HD.HI AWS 75.SI+ AD UP 75 AWS 65 BS CTB på AWS AF UDC 80
Egenskaper Renovering Design och estetik
Plats Berlin, Berlin
Färdigställande 2023
Arkitekter EUREF-Consulting Gesellschaft von Architekten und Ingenieuren
Fackföretag FKN Fassaden
Bildkälla © Stefan Brückner

Important example of industrial architecture

Constructed between 1908 and 1910, the gas tanks supplied the city with gas for decades and could store up to 160,000 cubic metres of fuel. The imposing steel structure, which was granted listed building status in 1994, has been a defining feature of the cityscape as a symbol of Berlin's Industrial Age. After being decommissioned, however, the building stood empty for a long time – until the site became part of the EUREF-Campus innovation park and the new owners presented a project to re-design the landmark.

New concept for use in a historic steel frame

The comprehensive renovation of the enormous gas tank commenced in 2007. The iconic steel construction was fully preserved, while the space on the inside was radically re-designed: a 15-storey office tower with around 35,000 m² of usable space was integrated into the circular floor plan – visually floating within the old ring and maintaining a respectful distance of one metre from the original structure. This created modern office spaces, flexible-use event areas and an apartment on the upper floor. This means the Gasometer is equipped to meet the requirements of the 21st Century, without sacrificing its former character.

Maximum flexibility with the highest level of system reliability

The façade construction in particular shapes the appearance of the new office building: the closed glass façade engages in an exciting way with the historic steel structure. Built as a special construction, the unitised façade features smooth curves, slimline profile face widths and uniform façade lines that come together to create a timeless design. Thanks to the tested system structure with engineered attachment details at the fixing points and clearly defined interfaces, the project could be fully controlled at all times, even within the confined space on site. The large wind loads at a height of over 70 metres and the accompanying loads for external sun shading also had to be considered. CTB from Schüco is able to withstand these loads and creates a balance between climate protection, the use of natural light and a restrained design for increased user comfort.

Produktinformation

FWS 50

Schüco Fasadsystem FWS 50

Kraftfull post-spröjs-fasad med 50 mm synlig bredd - grunden för ett brett utbud av lösningar

Schüco Fasadsystem FWS 50 är ett övertygande grundsystem för fasader och takfönster med hög flexibilitet och attraktiva designalternativ - inklusive optimerade tillverknings- och monteringsprocesser. Tack vare ett brett utbud av system kan lösningar för en mängd olika krav och applikationer implementeras.

Läs mer

ADS 75 HD.HI

Schüco Dörrsystem ADS 75 HD.HI

Multifunktionell lösning för stora format av kommersiella dörrar med hög belastning.

Schüco ADS 75 HD.HI (Heavy Duty High Insulated) dörrsystem i aluminium kombinerar hög hållbarhet med ett flertal funktioner och attraktiva designval - perfekt för kommersiella byggnader med höga krav på säkerhet.

Läs mer

AWS 75.SI+

Schüco Fönstersystem AWS 75.SI+

Improved thermal insulation, security and fabrication

The optimised Schüco AWS 75.SI+ (Super Insulation) standard window system for the 75 mm basic depth is part of the Schüco AWS system platform and forms the basis for a range of applications in energy-efficient building envelopes. Depending on the architectural requirements, the highly thermally insulated aluminium system can be used as a punched opening, ribbon window, façade insert unit or in combination with Schüco door systems.

Läs mer

AD UP 75

Schüco Dörrsystem AD UP 75

Universiellt användande både som kommersiell entré och elegant entrédörr.

Utmärkt värmeisolering kombinerat med hög stabilitet - Schüco AD UP 75 dörrsystem med 75 mm byggdjup erbjuder hög funktionell tillförlitlighet för alla önskemål i privata bostäder samt kommersiella byggnader.

Läs mer

CTB on AWS

Schüco Solskyddssystem CTB på Schüco Fönstersystem AWS

External surface-mounted aluminium micro louvre blade system for optimal shading

Ideal for use in offices and public buildings as well as private residential buildings: the Schüco CTB (Concealed Toughened Blind) sun shading system as a surface-mounted solution on Schüco AWS window systems. The sun shading is installed above the window in an insulated box, thereby fitting in perfectly with the look of the building. When raised completely, it is not visible due to its integration in the top box.

Läs mer

AF UDC 80

Schüco Fasadsystem AF UDC 80

Dynamisk elementfasadplattform med hög designfrihet

Schüco Fasadsystem AF UDC 80 (Aluminium Façade Unitized Dynamic Construction) ingår i den nya superflexibla elemenfasadplattformen Schüco AF UDC 80. Med sina skalbara och testade enheter erbjuder det dynamiska systemet arkitekter och producenter ett enkelt sätt att projektera och bygga projekt med enhetliga konstruktioner och ett brett utbud av användnings- och designalternativ baserat på effektiv planering och tillverkning.

Läs mer

High level of prefabrication enables precision as well as installation in record time

The façade units were fully prefabricated in the workshop, complete with glazing, gasket levels and mechanical attachments, then delivered to the building site ready for installation. This ensured fabrication was possible in any weather with the best machining quality and easy-to-calculate costs. The high level of prefabrication greatly simplified the construction site logistics, reduced installation times to a minimum and ensured that even an extraordinary building like the Gasometer could be fitted with an attractive, energy-efficient building envelope in a very short period of time. Its incredible installation scenario – with only one metre's width of space between the steel construction and building shell – was handled with confidence. A specially developed track system transported the units, which were up to eight metres tall and two tonnes in weight, precisely around the building before they were craned in at their installation height. The unitised construction method enabled fast, reliable and ultra-precise installation – a key factor for a project of this scale.

A landmark that preserves history and shapes the future

Thanks to the comprehensive renovation, the Gasometer has become a symbol of a new beginning. The building is now the central element of the EUREF Campus, supporting digitalisation, innovative energy use and international meetings with stunning panoramic views over Berlin. The project proves that the architecturally complex re-designing of decommissioned gasometers can be an economical, reliable and sustainable process, while also offering inspiration for the conversion of numerous other industrial buildings that are waiting for their future.