Schüco Corporate Services

Choosing modernisation over newbuild

The Schüco Corporate Services building has been completely modernised from top to bottom. All of the aluminium components from the existing building were fed back into the raw material cycle to be recycled. In their place is now a Cradle-to-Cradle certified AF UDC 80 unitised façade, which gives the building a new lease of life. With regard to the office design, Schüco followed the concept of New Work, a forward-thinking approach to the workplace.

Referans detayları

Ürün Ofis ve yönetim
Ürün alanları Pencereler Kapılar Cepheler FACID Havalandırma Güneş kırıcı Güvenlik Otomasyon
Schüco Sistemleri FWS 50.SI AWS 75 PD.SI AF UDC 80 ADS 80 FR 30 FWS 60.HI FWS 60 AD UP 75 AWS 75 BS.HI+ AWS 75.SI+ FACID 65 FWS 50 FireStop ADS 76.NI SP
Özellikler Renovasyon Enerji verimliliği Cradle-to-Cradle Döngüsellik
Konum Bielefeld, Germany
Tamamlama 2021
Mimarlar tr.architekten Rössing-Tilicke
Uzman şirket Hilzinger Metallbau
Görsel kaynakça Frank Peterschröder

A milestone on the company campus

The Schüco company headquarters has been expanded and restructured continually since 2016. One renovated building is the Digital Hub One office complex, a former production hall which has been modernised according to the principles of New Work, while newbuilds include the Schüco One building designed by architectural practice 3XN and the Schüco carpark with its striking textile façade. After three years of renovation work, the Schüco Corporate Services building was made available to its users, the Finance and IT departments, at the end of 2021.

Three building structures, one unit

The complex is comprised of three building structures made of reinforced concrete: a seven-storey construction facing the future company headquarters Schüco One, a six-storey building along Karolinenstraße and a long, two-storey low-rise parallel to Herforder Straße. These three buildings were constructed one-by-one from the 1960s to the 1980s. In 2001, the façade of the complex, which was constructed as a Schüco ribbon window system, received a second suspended skin made of glass and aluminium. The interior of UZB, however, had remained largely unchanged, with its components more or less in their original condition. 

Fundamental restructuring

The main reason for the most recent conversion was the fact that the existing building fabric no longer complied with current fire protection requirements. While examining the building further, other technical and functional shortcomings were found, for example with regard to the service and sanitation systems and barrier-free access. Aesthetically speaking, the complex was also in need of an update. The colours of the interior had not been changed since the 1980s, and the suspended ceilings in the corridors and offices were outdated. To add to that, there was a lack of open workspaces and smart, inviting rooms for informal communication. It was clear to Schüco and the Cologne-based architectural practice tr.architekten, who were commissioned to create the design, that the complex was not only in need of technical renovations but would also require a complete refurbishment of the interior.

Geöffnete Schiebetür von Schüco mit Blick in den Wohnbereich

The New Work workplace concept

The design team approached the renovation in various stages. The office levels were completely redesigned in line with the principles of New Work. The areas are designed to accommodate 160 Schüco employees. Rooms for meetings with external auditors and tax advisors were also constructed. Open areas with the option of desk sharing, individual offices providing a quiet working environment, as well as meeting rooms and zones for informal communication alternate with one another in the floor plans. The end users of the complex were also involved throughout the design process, in order to increase acceptance of the new ways of working.

Acquired usable space

The reception and foyer and the staircases and lifts were also given a new lease of life. To do this, the existing lift shaft in the centre of the building was removed. A new lift was constructed at the intersection of the three building structures, at the rear-facing courtyard façade. The design team repurposed the extra usable space into open-plan communication zones.

A timeless building envelope

Another key element of the new design was to reinvigorate the façade, which required the existing aluminium components to be dismantled. "With the Schüco Corporate Services building, we've followed a holistic design approach," explains André Schreiber, the architect at Schüco responsible for the project. "This means that the façades should also be long-lasting and timeless. In keeping with the idea of showcasing as many of our products in use as possible on the campus, we have put the Cradle to Cradle-certified AF UDC 80 unitised façade to use for the very first time. "Even with the new building envelope, the three parts of the existing building are still recognisable as distinct structures. At the same time, the unitised façade lends them a muted, homogenous external appearance. In this way, the Schüco Corporate Services building offers a refreshing contrast to the bold and expressive design of the Schüco One newbuild opposite.

Geöffnete Schiebetür von Schüco mit Blick in den Wohnbereich

Project-specific details

The unitised construction of the UDC 80 façade enables it to be easily adapted to any type of structural scenario and distribution of functions in the building. The façade of the Schüco Corporate Services building was assembled out of around 332 prefabricated units. Vent and panoramic windows, closed panel fields, and ventilation vents are alternated throughout the façade. For the first time, the Schüco AB ZDS (Aluminium Blind Zip Design Screen) sun shading system, which is an external, textile roller blind system, was integrated in the unitised façade.  The cover caps on the windows are another special detail of this project. These extend from the façade in three different lengths, creating a subtle play of shadows on the building envelope.

Back into the raw material cycle

As soon as the decision was made to renovate the façade, Schüco was determined to make recycling a priority. The existing façade of the complex from the 1980s and 2000s contained a large amount of aluminium. Schüco is also a founding member of the A|U|F, an association which organises a closed-loop recycling process for aluminium from the window, door and façade industry. It was natural, then, to dismantle all of the aluminium components from the façade and canopy, and feed them back into the A|U|F raw material cycle. In order to ensure that only aluminium was fed into the cycle, the company in charge of demolition collected the individual constituent materials in separate containers as much as possible. The aluminium was then recycled in several container loads by companies belonging to the A|U|F. In total, 28 tonnes of the material were extracted from the building, which was confirmed by European Aluminium (EA) following an external audit, which confirmed a recycling rate of 98.3%.

Geöffnete Schiebetür von Schüco mit Blick in den Wohnbereich

Recycling rates recorded for the first time

In 2014, the EA began to survey the recycling rate of different buildings in Europe following demolition or renovation in order to independently confirm high recycling rates of aluminium. This figure is also used in the basic assumptions when calculating an Environmental Product Declaration (EPD). Before long, the EA began a new way of measuring recycling rates. They called on their members to name projects that would verify their recycling rates. Schüco answered this call. The audit results from the Schüco Corporate Services building were the first to be included in this new survey. 

A holistic approach

In addition to the UDC 80, other C2C Silver-certified products were used such as the FWS 50 / 60 SG mullion/transom construction for the entrance façade, the AWS 75 BS insert units and the AD UP 75 doors. Following the renovation, the building now meets the ambitious KfW 70 standard and consumes 265,000 kWh less primary energy per year than before as a result. The renovated building is supplied with certified green energy and receives heating energy and hot water via district heating.

Building materials from renewable resources

The roofs, for instance, are insulated with cellulose fibres. A green roof is also in the works. This 500 m² green space will encourage insect diversity, improve the microclimate both in and around the building, and reduce noise and pollution. The construction companies similarly took precautions to minimise pollution and noise while they worked on the building. Schüco chose to work predominantly with local businesses to reduce time spent on construction and on transporting materials. The project is being subsidised by the Ministry for the Environment, Conservation, Agriculture, and Consumer Protection in the state of North Rhine-Westphalia. 

Ürün bilgileri

FWS 50.SI

Schüco Cephe Sistemi FWS 50.SI

Çeşit bakımından zengin çözümler için pasif ev sertifikalı düşey/yatay cephe

Öncü izolatör teknolojisini baz alan Schüco Cephe Sistemi FWS 50.SI (Super Insulated), optimum üretim ve montaj işlemleri de dahil olmak üzere, pasif ev seviyesinde çeşit bakımından zengin cephelerin ve ışıklıkların uygulanması için yüksek ısı yalıtımlı çözümler sunar.

Daha fazla bilgi edin

AWS 75 PD.SI

Schüco Pencere Sistemi AWS 75 PD.SI

Yük taşıyan yapının dar görünüm genişliğiyle maksimum saydamlık

Enerji verimliliğinin yanında biçimin ve işlevin kaynaştırılması, modern binalarının gerçekleştirilmesi için günümüzde temel bir gerekliliktir. Schüco AWS 75 PD.SI (Panorama Design Super Insulated) süper izolasyonlu panoramik tasarımlı pencere sistemi ile Schüco ilk defa, bu mimari gereksinimleri mükemmel şekilde karşılıyor: minimal iç ve dış görünümler ayrıca mükemmel ısı yalıtımı ile.

Daha fazla bilgi edin

AF UDC 80

Schüco Cephe Sistemi AF UDC 80

Yükek tasarım özgürlüğüne sahip dinamik panel cephe

Schüco Cephe Sistemi AF UDC 80 (Aluminium Façade Unitized Dynamic Construction), Schüco AF UDC 80 Alüminyum Panel Cepheler için sistem platformunun bileşenidir. Dinamik sistem, ölçeklenebilir ve test edilmiş yapı gruplarıyla mimarlara, planlamacılara ve işleyicilere, verimli planlamaya ve işlemeye dayanan geniş uygulama ve tasarım yelpazesi ile, inşaatların panellere ayrılmış yapı tarzında gerçekleştirilmesini sunar.

Daha fazla bilgi edin

ADS 80 FR 30

Schüco Kapı Sistemi ADS 80 FR 30

Çok fonksiyonlu yangına dayanımlı ve duman geçirimsiz kullanımlar için kapı ve duvar tasarımı

Oldukça sağlam 5 odacıklı içi boş profillere dayanan, kendini kanıtlamış Schüco kapı sistemi ADS 80 FR 30 (Yangına Dayanıklı) 80 mm yapı derinliğine sahiptir ve kullanım, işlev ve tasarım açısından çok yönlülüğü ile etkileyicidir.

Daha fazla bilgi edin

FWS 60

Schüco Cephe Sistemi FWS 60

60 mm ön görünüm genişliğine sahip güçlü düşey/yatay cephe – çeşit bakımından zengin çözümler için temel

Schüco Cephe Sistemi FWS 60, optimum üretim ve montaj işlemleri de dahil olmak üzere, cepheler ve ışıklıklar için yüksek esneklik ve cazip tasarım seçenekleri ile temel sistem olarak etkileyicidir. Geniş çaplı bir sistem programı sayesinde farklı talepler ve uygulamalar için çözümler gerçekleştirilebilir.

Daha fazla bilgi edin

AD UP 75

Schüco Kapı Sistemi AD UP 75

Yoğun kullanımlı ticari kapı ve tasarım odaklı ev kapısı olarak üniversal kullanım

Yüksek dayanıklılık ile kombine edilmiş mükemmel yalıtım özellikleri – 75 mm'lik montaj derinliğine sahip Schüco Kapı Sistemi AD UP 75, lüks konut ve ticari projelerin tüm gereksinimleri için yüksek işlev güvenliği sunar.

Daha fazla bilgi edin

AWS 75 BS.HI+

Schüco Pencere Sistemi AWS 75 BS.HI+

Gelişmiş tasarım gereksinimleri için yüksek ısı yalıtımlı, gizli kanatlı blok pencereler

Mükemmel ısı yalıtım değerleri ve görünür kanat konturları olmayan ince tasarımı ile Schüco AWS 75 BS.HI (Block System High Insulated), mümkün olan en yüksek şeffaflıkla en yüksek enerji ve mimari gereksinimleri karşılar.

Daha fazla bilgi edin

AWS 75.SI+

Schüco Pencere Sistemi AWS 75.SI+

Isı yalıtımı, güvenlik ve üretimde bir artı

75 mm inşaat derinliği için optimize edilmiş standart pencere sistemi Schüco AWS 75.SI+ (Super Insulated), Schüco AWS sistem platformunun bir parçasıdır ve enerji tasarruflu bina kılıflarında çok çeşitli uygulamaların temelini oluşturur. Mimari gereksinimlere bağlı olarak, yüksek ısı yalıtımlı alüminyum sistem delikli pencere, şerit pencere, cephe geçme elemanı olarak veya Schüco kapı sistemleri ile kombinasyon halinde kullanılabilir.

Daha fazla bilgi edin

FACID 65

Schüco Cephe Sistemi FACID 65

Geniş kullanım ve tasarım yelpazesine sahip çok işlevli kumaş cephe

Sürdürülebilir bina yapımı, tüm bina yaşam döngüsü boyunca giderek daha çok hesaba katılıyor ve işlevsel ve esnek cephe talepleri de giderek artıyor. Schüco FACID 65 Kumaş Cephe ile bir binanın dış görünümü, fonksiyonel kısıtlamalar olmaksızın değişen ihtiyaçlara hızlı ve verimli bir şekilde adapte edilebilir - cephe dönüşümü yolunda önemli bir kilometre taşı.

Daha fazla bilgi edin

FWS 50

Schüco Cephe Sistemi FWS 50

50 mm ön görünüm genişliğine sahip güçlü düşey/yatay cephe – çeşit bakımından zengin çözümler için temel

Schüco Cephe Sistemi FWS 50, optimum üretim ve montaj işlemleri de dahil olmak üzere, cepheler ve ışıklıklar için yüksek esneklik ve cazip tasarım seçenekleri ile temel sistem olarak etkileyicidir. Geniş çaplı bir sistem programı sayesinde farklı talepler ve uygulamalar için çözümler gerçekleştirilebilir.

Daha fazla bilgi edin

FireStop ADS 76.NI SP

Schüco Kapı Sistemi FireStop ADS 76.NI SP

Yüksek esnekliğe sahip yalıtımsız yangın geçirimsiz sistem

Yenilikçi açık kanallı tek odacıklı profile sahip, yalıtımsız, dumandan koruma kapı sistemi Schüco FireStop ADS 76.NI SP (Non Insulated Smoke Protection) Schüco FireStop Plattform'u baz alır– bu, planlamada ve uygulamada yüksek esneklik sağlar.