Z-zwo

Renovation of an existing building with a bright future

With the complete renovation of its Z2 corporate building in Stuttgart, Ed. Züblin AG is sending a clear message about sustainable construction. In the space of just 18 months, the six-storey office building underwent a comprehensive, energy-efficient refurbishment and an architectural reinterpretation using a BIPV façade and Cradle to Cradle certified systems from Schüco.

Λεπτομέρειες για το έργο αναφοράς

Τύπος κτιρίου Κτίριο γραφείων
Κατηγορίες προϊόντων Παράθυρα Υαλοπετάσματα BIPV
Συστήματα Schüco AWS 65 FWS 35 PD.HI BIPV
Χαρακτηριστικά Ανακατασκευή Απανθρακοποίηση Ενεργειακή απόδοση Cradle-to-Cradle
Τοποθεσία Stuttgart Degerloch, Baden-Württemberg
Ολοκλήρωση 2024
Αρχιτέκτονες Ed. Züblin AG
Εξειδικευμένη εταιρεία Forster Fassadentechnik GmbH,Schwend Metallbau
Πηγή εικόνας © Achim Birnbaum Teutonenstraße 4 70771 Leinfelden-Echterdingen

Environmentally-friendly renovation of an existing building

Instead of demolishing the Z2 building which was built in 2002, the decision was made to further develop it. The building shell, stairwells and sanitary facilities were preserved, while the façade and interior were completely renovated using reused or recycled materials. Supplemented with Cradle to Cradle building materials, the end product is a prime example of sustainable construction for existing buildings. The basis for the project was the digital design process using generative design. The building was captured parametrically to simulate hundreds of options for façade construction, use of natural light, air volume and heating and cooling loads. The result is a building that has been optimised for energy efficiency while also preserving the character of the ZÜBLIN Campus.

BIPV as an energy source and design feature

As an architectural principle, the incorporation of building-integrated photovoltaics was part of the renovation strategy right from the very beginning. The anthracite-coloured BIPV modules give the building its characteristic appearance and influence the energy balance of Z2. With a standard grid size of 1.35 x 0.9 metres, they harmoniously structure the façade and take on a safety barrier function in the fascia area as a “PV fence”. The system comprises a total of around 350 façade modules with an output of 107 kWp and a PV fence with an output of 29.1 kWp. Due to the irregular geometry and shading of the building, the layout was adjusted for the specific property. The uneven geometry of flat, concave and convex façade sections posed a particular challenge during planning and fabrication. While it was possible to fabricate the convex modules using heat at the factory, the concave elements had to be cold-fitted into the frames on site while under tension. This allowed the curvature of the façade to be precisely mapped out.

Innovation and the working environments of the future

In addition to the energy-efficient refurbishment, Z2 was transformed into a modern working environment with flexible room structures and digitally controlled building technology. Digital cycle control helped to optimise building processes and enabled the precise coordination of all trades. For the first time in the interior construction industry, a mobile 3D concrete printer was used. This further accelerated construction progress and allowed materials to be used in a targeted way. The renovated building meets the EH 40+ NH Efficiency House energy standard and has been awarded DGNB Platinum and QNG Premium certifications.

Πληροφορίες προϊόντος

AWS 65

Schüco Συστήματα παραθύρων AWS 65

Υψηλής ποιότητας σύστημα αλουμινίου με εκτεταμένες λύσεις

Το θερμομονωμένο σύστημα παραθύρων προσφέρει ως μέρος της Schüco AWS πλατφόρμας συστήματος εναλλακτικές για τις πιο διαφορετικές απαιτήσεις στο περίβλημα του κτιρίου για βάθος κατασκευής 65 mm.

Μάθετε περισσότερα

FWS 35 PD.HI

Schüco Σύστημα πρόσοψης FWS 35 PD.HI

Υψηλής θερμομόνωσης πανοραμικής σχεδίασης υαλοπέτασμα με ενσωματωμένη λύση για όλες τις γυάλινες γωνίες χωρίς διατομή

Ευήλια αρχιτεκτονική με τη μέγιστη δυνατή διαφάνεια, χωρίς συμβιβασμούς: Το υψηλής θερμομόνωσης σύστημα προσόψεων Schüco FWS 35 PD.HI (Panorama Design High Insulated) προσφέρει μια ολοκληρωμένη λύση, με την οποία όλες οι γυάλινες γωνίες μπορούν να εφαρμοστούν χωρίς κατακόρυφες διατομές. Το αποτέλεσμα είναι αντιπροσωπευτικές προσόψεις σχεδιασμού πανοράματος με εξαιρετική όψη και βέλτιστη θέα προς τα έξω, οι οποίες ανταποκρίνονται στις υψηλότερες απαιτήσεις σε ποιοτικές κατοικίες και εμπορικές κατασκευές.

Μάθετε περισσότερα

BIPV

Schüco Building Integrated Photovoltaics

Αποτελεσματικές λύσεις για αειφόρο παραγωγή ενέργειας στα κτίρια

Από το 2021, σύμφωνα με την ισχύουσα οδηγία για την οικοδόμηση της ΕΕ "2010/31 / ΕΕ", κάθε νέο κτίριο στα κράτη μέλη της πρέπει να εφαρμοστεί ως "σχεδόν μηδενικό ενεργειακό κτίριο" με μεγάλο βαθμό ισορροπημένης συνολικής ενεργειακήςς απόδοσης. Σε αυτό το πλαίσιο, η Ομοσπονδιακή Κυβέρνηση επιδιώκει τον στόχο της Γερμανίας να επιτύχει κλιματικά ουδέτερο οικοδομικό απόθεμα έως το 2050.

Μάθετε περισσότερα