Schüco Corporate Services

Choosing modernisation over newbuild

The Schüco Corporate Services building has been completely modernised from top to bottom. All of the aluminium components from the existing building were fed back into the raw material cycle to be recycled. In their place is now a Cradle-to-Cradle certified AF UDC 80 unitised façade, which gives the building a new lease of life. With regard to the office design, Schüco followed the concept of New Work, a forward-thinking approach to the workplace.

Detaljer om referencen

Bygningstype Kontor og administration
Produktkategorier Vinduer Døre Facader FACID Ventilation Solafskærmning Sikkerhed Automatisering
Schüco-systemer FWS 50.SI AWS 75 PD.SI AF UDC 80 ADS 80 FR 30 FWS 60.HI FWS 60 AD UP 75 AWS 75 BS.HI+ AWS 75.SI+ FACID 65 FWS 50 FireStop ADS 76.NI SP
Egenskaber Renovering Energieffektivitet Cradle-to-Cradle Cirkularitet
Placering Bielefeld, Germany
Færdiggørelse 2021
Arkitekter tr.architekten Rössing-Tilicke
Specialvirksomhed Hilzinger Metallbau
Billedkredit Frank Peterschröder

A milestone on the company campus

The Schüco company headquarters has been expanded and restructured continually since 2016. One renovated building is the Digital Hub One office complex, a former production hall which has been modernised according to the principles of New Work, while newbuilds include the Schüco One building designed by architectural practice 3XN and the Schüco carpark with its striking textile façade. After three years of renovation work, the Schüco Corporate Services building was made available to its users, the Finance and IT departments, at the end of 2021.

Three building structures, one unit

The complex is comprised of three building structures made of reinforced concrete: a seven-storey construction facing the future company headquarters Schüco One, a six-storey building along Karolinenstraße and a long, two-storey low-rise parallel to Herforder Straße. These three buildings were constructed one-by-one from the 1960s to the 1980s. In 2001, the façade of the complex, which was constructed as a Schüco ribbon window system, received a second suspended skin made of glass and aluminium. The interior of UZB, however, had remained largely unchanged, with its components more or less in their original condition. 

Fundamental restructuring

The main reason for the most recent conversion was the fact that the existing building fabric no longer complied with current fire protection requirements. While examining the building further, other technical and functional shortcomings were found, for example with regard to the service and sanitation systems and barrier-free access. Aesthetically speaking, the complex was also in need of an update. The colours of the interior had not been changed since the 1980s, and the suspended ceilings in the corridors and offices were outdated. To add to that, there was a lack of open workspaces and smart, inviting rooms for informal communication. It was clear to Schüco and the Cologne-based architectural practice tr.architekten, who were commissioned to create the design, that the complex was not only in need of technical renovations but would also require a complete refurbishment of the interior.

Geöffnete Schiebetür von Schüco mit Blick in den Wohnbereich

The New Work workplace concept

The design team approached the renovation in various stages. The office levels were completely redesigned in line with the principles of New Work. The areas are designed to accommodate 160 Schüco employees. Rooms for meetings with external auditors and tax advisors were also constructed. Open areas with the option of desk sharing, individual offices providing a quiet working environment, as well as meeting rooms and zones for informal communication alternate with one another in the floor plans. The end users of the complex were also involved throughout the design process, in order to increase acceptance of the new ways of working.

Acquired usable space

The reception and foyer and the staircases and lifts were also given a new lease of life. To do this, the existing lift shaft in the centre of the building was removed. A new lift was constructed at the intersection of the three building structures, at the rear-facing courtyard façade. The design team repurposed the extra usable space into open-plan communication zones.

A timeless building envelope

Another key element of the new design was to reinvigorate the façade, which required the existing aluminium components to be dismantled. "With the Schüco Corporate Services building, we've followed a holistic design approach," explains André Schreiber, the architect at Schüco responsible for the project. "This means that the façades should also be long-lasting and timeless. In keeping with the idea of showcasing as many of our products in use as possible on the campus, we have put the Cradle to Cradle-certified AF UDC 80 unitised façade to use for the very first time. "Even with the new building envelope, the three parts of the existing building are still recognisable as distinct structures. At the same time, the unitised façade lends them a muted, homogenous external appearance. In this way, the Schüco Corporate Services building offers a refreshing contrast to the bold and expressive design of the Schüco One newbuild opposite.

Geöffnete Schiebetür von Schüco mit Blick in den Wohnbereich

Project-specific details

The unitised construction of the UDC 80 façade enables it to be easily adapted to any type of structural scenario and distribution of functions in the building. The façade of the Schüco Corporate Services building was assembled out of around 332 prefabricated units. Vent and panoramic windows, closed panel fields, and ventilation vents are alternated throughout the façade. For the first time, the Schüco AB ZDS (Aluminium Blind Zip Design Screen) sun shading system, which is an external, textile roller blind system, was integrated in the unitised façade.  The cover caps on the windows are another special detail of this project. These extend from the façade in three different lengths, creating a subtle play of shadows on the building envelope.

Back into the raw material cycle

As soon as the decision was made to renovate the façade, Schüco was determined to make recycling a priority. The existing façade of the complex from the 1980s and 2000s contained a large amount of aluminium. Schüco is also a founding member of the A|U|F, an association which organises a closed-loop recycling process for aluminium from the window, door and façade industry. It was natural, then, to dismantle all of the aluminium components from the façade and canopy, and feed them back into the A|U|F raw material cycle. In order to ensure that only aluminium was fed into the cycle, the company in charge of demolition collected the individual constituent materials in separate containers as much as possible. The aluminium was then recycled in several container loads by companies belonging to the A|U|F. In total, 28 tonnes of the material were extracted from the building, which was confirmed by European Aluminium (EA) following an external audit, which confirmed a recycling rate of 98.3%.

Geöffnete Schiebetür von Schüco mit Blick in den Wohnbereich

Recycling rates recorded for the first time

In 2014, the EA began to survey the recycling rate of different buildings in Europe following demolition or renovation in order to independently confirm high recycling rates of aluminium. This figure is also used in the basic assumptions when calculating an Environmental Product Declaration (EPD). Before long, the EA began a new way of measuring recycling rates. They called on their members to name projects that would verify their recycling rates. Schüco answered this call. The audit results from the Schüco Corporate Services building were the first to be included in this new survey. 

A holistic approach

In addition to the UDC 80, other C2C Silver-certified products were used such as the FWS 50 / 60 SG mullion/transom construction for the entrance façade, the AWS 75 BS insert units and the AD UP 75 doors. Following the renovation, the building now meets the ambitious KfW 70 standard and consumes 265,000 kWh less primary energy per year than before as a result. The renovated building is supplied with certified green energy and receives heating energy and hot water via district heating.

Building materials from renewable resources

The roofs, for instance, are insulated with cellulose fibres. A green roof is also in the works. This 500 m² green space will encourage insect diversity, improve the microclimate both in and around the building, and reduce noise and pollution. The construction companies similarly took precautions to minimise pollution and noise while they worked on the building. Schüco chose to work predominantly with local businesses to reduce time spent on construction and on transporting materials. The project is being subsidised by the Ministry for the Environment, Conservation, Agriculture, and Consumer Protection in the state of North Rhine-Westphalia. 

Produktinformationer

FWS 50.SI

Schüco Facadesystem FWS 50.SI

Passivhus-certificeret post/sprosse facade til en række forskellige løsninger

Baseret på banebrydende isolator teknologi tilbyder Schüco FWS 50.SI (Super Insulated) facadesystemet høje termisk isolerede løsninger til design af forskellige facader og glastag til passivhus-niveau, herunder optimerede fremstillings- og installationsprocesser.

Læs mere​

AWS 75 PD.SI

Schüco Vinduessystem AWS 75 PD.SI

Den smalleste profilbredde for aluminium åbningselementer – kan udføres som murhuls vindue, som vinduesbånd eller til indsættelse i Schüco facadesystemer.

Udover energieffektivitet, er den seamless integration i form og funktion i dag et fundamentalt krav, når man skaber klimaskærme til moderne bygninger. Med den nye AWS 75 PD.SI Panorama Designvindue, tilbyder Schüco nu en åbningsenhed med minimal indvendig og udvendig synsbredde, som imødekommer alle arkitektoniske krav. Systemfunktionerne er skræddersyet til hinanden. Dette inkluderer et bindig ramme udtryk på indersiden, visuel minimale tætningslister, maksimal transparens med den smalleste indvendige og udvendige profilbredde såvel som harmoniske synsbredder for både faste felter og oplukkelige felter for samlet ensartet udtryk. Skjult dræn og det klare designsprog med definerede profilkanter fuldender vinduessystemet Schüco AWS 75 PD.SI Panorama Design.

Læs mere​

AF UDC 80

Schüco Facadesystem AF UDC 80

Dynamisk facadesystemplatform Schüco AF UDC 80 - høj designfrihed til opførelse af projekter med elementfacadesystem

Schüco facade AF UDC (Unitized Dynamic Construction) er en del af Schücos nye elementfacadeplatform, som giver mulighed for en mere effektiv realisering af byggeprojekter ved hjælp af facadeelementer med et bredt spektrum af designvarianter.

Læs mere​

ADS 80 FR 30

Schüco Dørsystem ADS 80 FR 30

Dør- og vægkonstruktionen til multifunktionelle anvendelser. Serien er testet i henhold til europæiske (EN 1364/1634) og tyske standarder (DIN 4102) og opfylder kravene til brandmodstandsklasserne EI30 (T/F30) og EW30 (G30).

Læs mere​

FWS 60

Schüco Facadesystem FWS 60

Ny Schüco FWS 50 / FWS 60 post/sprosse facade forener en enkel produktion med den bedste energieffektivitet på passivhusniveau.

Schüco facaden FWS 50 / FWS 60 sætter nye standarder for produktion og energieffektivitet. Ved videreudviklingen af de velkendte systemer har der været stor fokus på optimering af produktionen i værkstedet og på byggepladsen. Nye præfabrikerede systemkomponenter sørger f.eks. for en væsentlig hurtigere og dermed mere rationel produktionsproces.

Læs mere​

AD UP 75

Schüco Dørsystem AD UP 75

Dørsystem med 75 mm byggedybde til anvendelse som dør i projektbyggeri med høj trafik samt som designdør til den private villa

Schüco AD UP 75 er en universel platform for aluminiumsdøre, der kombinerer fremragende isoleringsegenskaber med høj stabilitet. Takket være dørsystemets konstruktionsprincip opnår dørene gode statiske værdier og sikrer en høj funktionssikkerhed til enhver anvendelse - både til luksusvillaer samt til større projektbyggeri.

Læs mere​

AWS 75 BS.HI+

Schüco Vinduessystem AWS 75 BS.HI+

Høj termisk isoleret blokvindue med skjult ramme til sofistikerede designkrav

Med enestående varmeisolerings-værdier og et slankt design uden synlige ramme konturer opfylder Schüco AWS 75 BS.HI+ (Block System High Insulation) de højeste energieffektivitet og arkitektoniske krav med den størst mulige gennemsigtighed.

Læs mere​

AWS 75.SI+

Schüco Vinduessystem AWS 75.SI+

Schücos velkendte standardserie, men i en superisoleret (SI) variant. Fremstillingsprocessen er desuden optimeret ved hjælp af SimplySmart-teknologien.

Schüco-vinduet AWS 75.SI+ er siden præsentationen i 2005 blevet en fast del af Schücos AWS 75 standardserie. For at leve op til fremtidens krav til lovgivningen samt markedets generelle ønske om mere effektive byggeprocesser, er Schüco-systemet AWS 75.SI+ ikke kun blevet energimæssigt optimeret, men giver med SimplySmart-teknologien tidsmæssige fordele ved fremstillingen.

Læs mere​

FACID 65

Schüco Facadesystem FACID 65

Mange muligheder, høj funktionalitet og med stor designfrihed - FACID, den første tekstilfacade i Schüco kvalitet

Idéen om at bygge bæredygtigt bliver stærkere for hver dag og påvirker bygningernes livscyklus - dermed stiger efterspørgslen efter funktionalitet og fleksibilitet for facaden. Med FACID, den fleksible facade, kan bygningen hurtigt og effektivt tilpasses de forandrede krav udvendigt - en vigtig milepæl på vejen for den transformative facade.

Læs mere​

FWS 50

Schüco Facadesystem FWS 50

Ny Schüco FWS 50 / FWS 60 post/sprosse facade forener en enkel produktion med den bedste energieffektivitet på passivhusniveau.

Schüco facaden FWS 50 / FWS 60 sætter nye standarder for produktion og energieffektivitet. Ved videreudviklingen af de velkendte systemer har der været stor fokus på optimering af produktionen i værkstedet og på byggepladsen. Nye præfabrikerede systemkomponenter sørger f.eks. for en væsentlig hurtigere og dermed mere rationel produktionsproces.

Læs mere​