City Tower (CTX)

Inner city renovation with an emphasis on recycling

The City Tower building (CTX for short), which is the second tallest building in central Bielefeld, is being renovated. The building, which was erected in 1974 and used as the state central bank for a number of years, is being extensively refurbished to improve energy efficiency and will combine residential units with office and commercial space.

项目案例详情

建筑类型 办公与行政
产品
旭格系统 AWS 75.SI+ ADS 80 FR 30
特征 翻新改造
地点 Bielefeld, Germany
竣工时间 2025
建筑师 Stopfel Architekten BDA
专业公司 ASP Metallbau GmbH
图片版权 © Kirill Starodubskij

Energy-efficient refurbishment

By current standards, the condition of the building envelope is inadequate in terms of energy efficiency. “Because of this, a central aim of the renovation was to radically modernise the almost completely non-insulated building,” reports architect Frank H. Stopfel. The 15 residential units must meet the KfW efficiency house 70 energy standard and for the office spaces, a KfW efficiency house 55 standard is planned. This means that only 55% of the primary energy will be required compared to the Buildings Energy Act reference building. “The relevant grants have already been approved,” says the architect. “It was a time-consuming process involving a thorough evaluation of the costs and feasibility.” As well as the façade, the new Schüco windows combined with the glazing make a significant contribution to improving energy efficiency. The building's appearance also benefits from this. The façade will be more clearly structured and the exterior will have a more linear look. The greyish-red clay tiles in the spandrel areas, into which modern dark-grey Schüco aluminium windows are integrated, will be a characteristic feature of the building for years to come.

How City Tower is expected to look after the renovation. © Stopfel Architekten

Renovating an occupied property

All of the renovation work will be completed whilst the building is in use. “None of the residents will need to vacate the premises whilst the work is carried out,” reports project client Christoph Buse. “We will continue to lease the building without interruption during the ongoing renovation.” To limit the restrictions imposed on the users of the building, the parties involved in the construction process have agreed to complete the work section by section. A test run, which involved installing a sample façade with the most important window details and attachments on the eastern side of the building, provided additional certainty with regard to implementation. “We were able to incorporate the findings from the test run into the final agreement on the interior and exterior planning,” comments Frank H. Stopfel.

产品信息

AWS 75.SI+

旭格AWS 75.SI+窗系统

优化隔热性能、安防水准和加工流程

结构深度为75 mm的旭格AWS 75.SI+超隔热窗系统作为旭格AWS窗系统平台的一部分提供多样化的节能建筑外立面解决方案,满足不同应用需求。这个超隔热窗系统可按建筑设计要求作为洞口窗、带状窗、幕墙塞窗或与旭格门系统组合使用。

对开发商和建筑师还有另一项优势,该窗系统能实现多种开启类型,如内倾推拉、上亮下悬及垂直摆扇。

作为系统平台的组成部分,该窗系统提供众多的型材产品,例如组角竖框、结构竖框、对称和不对称竖框,此外还有各种设计类型以及更多与其他旭格产品的组合方案,例如与旭格遮阳系统或旭格通风系统组合。

这个引领未来的扩展系统基于“从摇篮到摇篮”(C2C)概念 — 适用于设计规划可持续发展建筑,使用经过有害物质和回收率检测评估的建筑组件:原材料制成的产品在使用寿命到期后经过回收能重新作为高品质材料循环使用。旭格AWS 75.SI⁺窗系统通过了汉堡环境保护促进协会(EPEA)的检测,符合美国C2C产品创新研究所颁布的现行C2C标准并获得了银奖证书。

了解更多​
The renovation work on City Tower in Bielefeld is in full swing. © Kirill Starodubskij

A firm focus on recycling

The architects and clients chose to adopt a circular approach for the renovation. Old granite façade components will be shredded and reused in the construction of roads. Used Schüco aluminium windows will be taken back and processed, so that the aluminium can be reused to produce new construction profiles. Schüco has developed a custom concept for this, which envisages the collection and recycling of a total of 298 window units. “The logistics for the building site were particularly challenging, as the property is located on a narrow intersection on one of the main inner city roads in Bielefeld,” recalls Uwe Pöttger from ASP Metallbau. The removal and installation of the windows have to be coordinated very precisely. According to initial estimations, the CTX Tower will be able to feed 29.7 tonnes of aluminium back into the material cycle. By purchasing Schüco Low Carbon (LC) aluminium, an additional 3.27 tonnes of CO2 will be saved compared to the standard Schüco aluminium profiles. This is possible due to the proportion of post-industrial scrap metal in the LC aluminium.

City Tower in Bielefeld before the renovation. © Stopfel Architekten

Refurbishment of fire and smoke protection

In addition to the energy efficiency goals, a focus was also placed on upgrading the fire protection. The escape routes, stairwell and fire-break airlocks had already been renewed in 2017 due to fire protection requirements. Smoke doors will now be added inside the building. “With renovation projects of this kind, we often find that the fire protection measures (or the way they were implemented) that were considered correct at the time of construction are inadequate by today's standards and have to be upgraded accordingly,” says Frank H. Stopfel. With the Schüco ADS 65.NI SP aluminium smoke protection system, a durable and reliable smoke door will be installed throughout the building.