1. Investors
  2. References
  3. Highlights
  4. GSB Gym Bergedorf
To overview

GSB Gym Bergedorf

Hamburg, Germany

Short information

Building category
Education and Culture
Products
Windows, Doors, Façades, Security, Conservatories
Series
AWS 75 BS.SI+, Janisol-Fenster, RWA, Janisol 2 F30/T30, FW 50+, VISS HI
Location
Hamburg, Germany
Completion
2012
Architects
BKS Architekten
Specialist
Kahrmann GmbH

Gallery

Project details

Project description

The old sports hall at the district school in Bergedorf was severely damaged by a fire in 2009 and subsequently had to be demolished. The exterior of the new building opened in 2012 is characterised by dynamically modulated roof edges, asymmetrically positioned areas of glass, as well as a dark, irregular, relief-style clinker brick façade. Inside the sports hall, the colours green, blue and red are predominant. The translucent glazing at the side with Schüco FW 50+.HI provides natural daylight without any glare. Designed in black and white, the cultural space is flooded with daylight by the Schüco FW 50+.HI system.

Location

GSB Gym Bergedorf
Open in Google Maps