ICB Innovation Centre Campus

Bielefeld, Germany

Información sobre el proyecto de referencia

Tipo de construcción:

Oficinas y negocios

Productos:

Windows, Facades, Solar shading, Fire and smoke protection, Security

Series:

CCB, CTB, AWS 120 CC.SI, FWS 50.SI, AWS 75.SI+

Localización:

Bielefeld, Germany

Finalización:

2018

Arquitectos:

BGW - Bielefelder Gemeinnützige Wohnungsgesellschaft mbH

Especialista:

H.O. Schlüter GmbH

Derechos de imagen:

© Schüco International KG

Project details

Project details

The first building of the new OWL medical faculty beckons visitors to the University of Bielefeld. The long building with its rounded edge is located directly on the south campus and houses 8200 m2 of offices and labs for students and professors. The rooms run along the lengthy corridor, which is only broken up by stairwells and communication pods. A suspended, rear-ventilated aluminium façade with horizontal ribbon windows envelopes the building. The design features subtle grey tones. One of the recurring elements is the floors in the labs and meeting areas, which are designed in a vibrant apple green, as is an eye-catching section of the façade. Schüco FireStop ADS 90 FR 30 fire doors at the stairwell entrances provide safe and secure escape routes. They are colour-matched to the façade profiles, providing orientation on all floor levels.

Información de producto

Localización del proyecto de referencia

consent.maps.text